POWER GENERATION

Temporary three stage treatment for coal power station

An aging coal power station on the Portuguese coast was sending untreated feedwater straight to its ion-exchange resin. A three-stage mobile treatment plant, remotely monitored by Ecolutia teams in Spain, UK, Philippines and USA was implemented.

CLIENT
Coal-fired power station
LOCATION
Portugal
SERVICE
Temporary: demin water production
Multi-year: RO permeate production
DURATION
3 years
THE CHALLENGE

Feed water going straight to the resin

Unexpected changes in the raw feedwater supply began to cause problems for a coal power station built in the 1980s. Historically, feedwater pre-treatment was never required so the raw feedwater went straight to the customer’s ion-exchange treatment process. With increasingly lower demin water quality production the customer could no longer put off repairs needed to their ion-exchange system.

Requiring a temporary solution, with the root cause of the feedwater changes uncertain, Ecolutia accepted the challenge of providing a three-step demineralization process so the power station could continue producing electricity while the onsite investigation and refurbishment work continued.

The power station was on a preliminary shortlist to close, but output was secure for the next three years. However, constraints on site investment meant the customer insisted the Ecolutia solution had a high level of system automation and limited site visits to once every two weeks.

THE SOLUTION

Filtration, high-flow RO, and remote monitoring

Ecolutia filtration, reverse osmosis and ion exchange systems were installed and configured for remote monitoring, backed up with scheduled site visits. The site visits presented the only opportunity to undertake general maintenance or necessary changes so the automation needed to be robust.

The first step was the Ecolutia Proteus multi-media filtration system to remove contaminants in the feedwater taken from a nearby reservoir, fed by a local river. The close monitoring of the feedwater allowed adjustments to the volume and type of chemical dosing needed to remove the contaminants.

The second step was the Ecolutia Triton brackish water high-flow reverse osmosis system operating at 75% recovery, with a minimum of 97% rejection to produce up to 570 GPM of permeate water.

The third step was an ion-exchange demineralization system used while the customer completed maintenance work to their own demineralization plant. Two months later when the customer completed their work the Ecolutia system was taken offline, but the Ecolutia filtration and RO systems continued operating to feed the restored customer ion exchange plant.

The capacity of the filtration system and smooth operation of the RO allowed the refurbished ion-exchange plant to operate almost 24 hours a day, 7 days a week. Less than 30 minutes of filtration backwash was needed as the Proteus filtration tanks were set up to work in a duty/standby configuration.

TREATMENT FLOW PATH
FEED
River water via reservoir
MMF
Multi-media filtration
BWRO
Brackish water RO
IX
Selective ion-exchange resin
THE RESULTS

A three-month contract that became three years

Initially contracted as a 3 months temporary project, the customer continually extended the contract as Ecolutia systems helped reduce ion exchange regeneration frequency from once a day to once every 2 months. This saving in chemical use and deployment of manpower was notable.

The Ecolutia field service team continued with site visits every 2 weeks and the remote monitoring team kept operations under review 24/7. The customer also completed daily visual readings and feedback.

Following confirmation of the plant’s closure, the customer retained Ecolutia’s systems for a further 2.5 years until the remaining coal stock was used and electricity generation ceased. This helped avoid a capital investment needed for a new filtration system had the Ecolutia contract come to an end.

570 GPM
PERMEATE PRODUCTION
2 months
NO RESIN REGEN NEEDED
23.5 h/day
PLANT UPTIME, 7 DAYS A WEEK
ON SITE
MORE CASE STUDIES

Explore related projects

VIEW ALL
POWER GENERATION

Commissioning an air-cooled condenser on a zero-discharge site

ACC condensate polished back to demineralized quality on a zero-discharge site in France.

PETROCHEMICAL

Oxygen removal from boiler feed water — with the deaerator offline

Oxygen removal at ambient temperature while a refinery’s deaerator was offline.

DATA CENTERS

Hardness out of the cooling loop at a hyperscale data center

HydroPURE softening held cooling make-up hardness below 1 ppm, with N+1 redundancy intact at a hyperscale data center.