Lost production, time and revenue from material binding failures
A nonwoven textile manufacturer faced intermittent production failures because its hydroentanglement process did not adequately bond the base material to a high-value outer layer. Urgent action was needed, but the root cause was unclear amid several changes on site, including a new base material, new machinery and recent staff changes.
Ecolutia was asked to provide an emergency temporary solution so the existing system could be taken offline for investigation. Strict local discharge regulations added urgency to finding a permanent solution.
The site had to recycle wastewater containing high levels of organic fibers, turbidity of up to 150 NTU and a high risk of microbial growth. Water reuse in hydroentanglement and related wet processes requires turbidity below 1 NTU, zero ATP and water suitable for use in production of material that would be in contact with sensitive human skin.
Media backwashed out, and a multi-barrier strategy to replace it
During the initial investigation Ecolutia engineers found that the activated carbon filter media had been inadvertently discharged during backwashing, leaving the customer’s DAF the only filtration process. Within 24 hours, the Ecolutia team installed Ecolutia’s mobile Proteus multi-media filtration system downstream of the DAF, establishing the cornerstone of a multi-barrier treatment strategy for reliable water recycling.
Dosing of suitable coagulation and flocculation using turbidity and TSS data, while controlling pH, was introduced as the first step to improve the DAF filtration. Despite changing solids loads the DAF quickly started removing 70–90% of TSS before the following multi-media filtration step.
Implementing a consistent regime of backwashing the Ecolutia multi-media filtration systems during shift changes also reduced product water turbidity to below 1 NTU. Continuous ATP monitoring confirmed zero microbial activity, while Ecolutia onsite engineers and remote monitoring technical teams managed the site operations 24/7.
Emergency support that became a long-term collaboration
The consistently favorable results from the emergency solution were quickly noted by the customer. The Ecolutia multi-media filter and operational regime improved production runs to be more consistent and longer, while also reducing freshwater make-up needs. Discussions soon started about a long-term Ecolutia deployment as operational, financial, and environmental benefits were easily evident.
- Stable and reliable operation. Automated controls and 24/7 monitoring ensured consistent water quality, eliminating process disruptions.
- Cost savings. Optimized chemical dosing, reduced personnel requirements, and decreased downtime lowered overall operational costs.
- Sustainability. Significant reduction in freshwater use and wastewater discharge costs.
- Process integrity. Treated water met strict turbidity and microbial standards, enabling safe reuse.
The project combined advanced filtration technologies, process automation, proactive monitoring and skilled water chemistry knowledge to achieve its goal of producing consistent and reliable water quality for the customer. The collaboration resulted in a close working relationship for multiple years until site requirements ended.