Home / Case Studies / Tailing pond reuse
MINING & MINERALS

Wastewater ponds drained and treated for onsite water reuse

Two years of exceptional rainfall left a remote zero-liquid-discharge facility with highly elevated wastewater ponds. Ecolutia’s mobile fleet brought levels down safely — and turned the water into a usable asset for cooling-tower makeup.

CLIENT
Remote chemical manufacturing facility
LOCATION
Australia
SERVICE
Temporary: Pond remediation & water reuse
DURATION
1 year
THE CHALLENGE

Heavy rain looming, ponds at critical levels

Two consecutive years of significant rainfall at a remote zero liquid discharge facility left its wastewater ponds dangerously elevated — and previous attempts to reduce the levels had failed.

With the monsoon season looming, Ecolutia was contracted to urgently provide a temporary treatment service to bring pond levels down and avoid any potential environmental incident.

THE SOLUTION

Chemical, physical and membrane treatment in one train

Ecolutia’s mobile systems treated the ponds to produce water suitable for use as cooling-tower makeup. With several ponds of different composition, in-line monitoring managed automated chemical dosing against the fluctuating feed, while mixing tanks equilibrated water chemistry before the treatment process.

Two DAF units — switchable between series and parallel operation — with multi-media polishing ahead of membrane treatment stage
SWRO with concentrate recycle to maximise recovery, plus BWRO to protect cooling water chemistry
On-site sludge press cutting solid waste volume by over 90%, minimising landfill costs
TREATMENT FLOW PATH
DAF
Dissolved air flotation
MMF
Multi-media filtration
SWRO
Seawater RO
BWRO
Brackish water RO
THE RESULTS

Ponds consolidated to safe levels — site operational throughout

Over the year the ponds were drawn down to satisfactory safe levels so the local habitat and neighbouring farmland could continue to stay protected and productive. Reusing the recovered water eased pressure on the site’s stressed pre-treatment system, cutting freshwater use and bringing further cost and efficiency gains across the site.

44 m³/h
PRODUCTION FLOW
90%
SLUDGE VOLUME REDUCTION
1 yr
CONTINUOUS OPERATION
0
ENVIRONMENTAL INCIDENTS
ON SITE
MORE CASE STUDIES

Explore related projects

VIEW ALL
OIL & GAS

Outsourced water plant for a Southeast Asian crude oil refinery

A 10-year outsourced RO permeate plant running at under 1 kWh/m³.

POWER GENERATION

Commissioning an air-cooled condenser on a zero-discharge site

ACC condensate polished back to demineralised quality on a zero-discharge site in France.

FOOD & BEVERAGE

Generating a valuable water resource from milk evaporator condensate