Outsourced water plant for a Southeast Asian crude oil refinery

Invited to tender against the incumbent for a 10-year outsourced contract, Ecolutia won with a new treatment regime — safer to run, lighter on chemicals and power. Guarantees on quality and flow rates included.

CLIENT
Crude oil refinery
LOCATION
Southeast Asia
SERVICE
Multiyear: Outsourced filtration and RO permeate plant
DURATION
10 years
THE CHALLENGE

Beat the incumbent — and the region’s volcanic water

Ecolutia was invited to tender for a new 10-year outsourced contract to produce RO permeate at a refinery in Southeast Asia. The region’s volcanic geology brings silica up to 90 ppm from the deep wells, while the coastal location adds high hardness up to 100 ppm, and chlorides up to 900 ppm — problematic feedwater by any standard.

The incumbent offered continuity with the existing RO and no site disruption, so Ecolutia had to make a compelling case to demonstrate the benefits of a genuinely better solution.

THE SOLUTION

New chemistry instead of tonnes of salt

The existing site process relied on monthly deliveries of up to 10 tonnes of salt for softener regeneration, plus large volumes of caustic for pH control. The Ecolutia solution removed the need for these deliveries and removed any suspended matter using GAC before it was fed to Ecolutia’s Triton BWRO96. This was then followed by removal of dissolved O₂ and CO₂ using an FDA. The high-quality RO permeate was then fed to the customer’s storage tank for use on site.

Continuous monitoring, automated alarms and shutdown as backup
BWRO96 at 65% recovery and >95% rejection, with guaranteed power consumption per m³
FDA degasification and raising pH for downstream corrosion control
TREATMENT FLOW PATH
GAC
Activated carbon
CF
Cartridge filtration
BWRO
Brackish water reverse osmosis
FDA
Degasification
THE RESULTS

Every obligation met — at half the power

All contractual obligations were met or exceeded, with 100% permeate quality and flowrate availability. Power use fell from over 2 kWh/m³ to consistently under 1 — beating the <1.2 kWh/m³ contract spec and saving roughly US$10,000 a month on power alone. Eliminating bulk salt and caustic handling also made the site operations safer and more environmentally friendly.

<1 kWh/m³
MEASURED POWER USE
$10k/mo
POWER COST SAVINGS
100%
QUALITY & AVAILABILITY
10 t
SALT ELIMINATED MONTHLY
ON SITE
MORE CASE STUDIES

Explore related projects

VIEW ALL
PETROCHEMICAL

Oxygen removal from boiler feed water — with the deaerator offline

Oxygen removal at ambient temperature while a refinery’s deaerator was offline.

POWER GENERATION

24/7 seawater to demin for new coal power plant commissioning at a remote copper mine

Seawater treated to 0.06 µS/cm, producing 1,200 m³ of demin water a day in remote Chile.

MINING & MINERALS

Wastewater ponds drained and treated for onsite water reuse

Elevated wastewater ponds drawn down safely and water reused for cooling-tower makeup.

RETHINKING AN OUTSOURCED PLANT?
Guaranteed water quality and water quantity
REQUEST A CONSULTATION